现代制造工程 ›› 2017, Vol. 447 ›› Issue (12): 114-118.doi: 10.16731/j.cnki.1671-3133.2017.12.021

• 制造技术/工艺装备 • 上一篇    下一篇

考虑刀具约束的作业车间调度研究

曹阳明, 周亚勤, 杨建国, 刘凯强   

  1. 东华大学机械工程学院,上海 201620
  • 收稿日期:2016-10-31 出版日期:2017-12-20 发布日期:1900-01-01
  • 作者简介:曹阳明,硕士,主要研究方向为车间生产调度。 E-mail:190842681@qq.com
  • 基金资助:
    国家重大科技专项项目(2013ZX04001-141)

The research on job-shop scheduling by considering tool constraints

Cao Yangming, Zhou Yaqin, Yang Jianguo, Liu Kaiqiang   

  1. College of Mechanical Engineering,Donghua University,Shanghai 201620,China
  • Received:2016-10-31 Online:2017-12-20 Published:1900-01-01

摘要: 为了解决车间刀具资源有限条件下的作业调度问题,首先分析考虑车间刀具约束的作业调度问题的特征,工件的工艺路线约束包括机床约束、刀具约束和工序时间约束,同时考虑机加工工序与非机加工工序,进行考虑车间刀具约束的作业调度数学模型的建立,目标是使系统完工时间最短;然后研究用于解决此生产调度模型的免疫遗传算法,实现其中的关键操作因子,包括编码、选择、交叉、变异,以及考虑刀具约束的解码等操作,得到满足车间刀具约束的生产调度方案。实例分析结果表明:与不考虑车间刀具约束的作业调度相比,通过改进的免疫遗传算法求解考虑刀具约束的作业车间调度问题,在实现对车间生产任务排产的同时,还能够考虑车间刀具资源的约束,可以在一定程度上避免在刀具资源有限条件下因刀具使用冲突而导致的停机问题。

关键词: 刀具约束, 作业调度, 免疫遗传算法

Abstract: In order to solve the job-shop scheduling problem in the workshop where tool resources are limited,we first need to analyze the characteristics of the job-shop scheduling problem by considering tool constraints.The constraints of the processing route include machine constraints,tool constraints,and processing time constraints.At the same time non-machine processing and machine processing are also considered.A job-shop production scheduling model that considers tool constraints was proposed,in which the objective was to minimize system make-span.Then in order to obtain the production scheduling scheme which considers the actual production situation of the workshop,the immune genetic algorithm was used to solve the scheduling model,including encoding,selection,crossover,mutation,and decoding.Example analysis results show that not only can it obtain the Gantt chart for workshop production scheduling,but compared with the production scheduling without considering the constraints of tool,it can also satisfy the constraints of tool resources in the workshop.To a certain extent,it can avoid the halting issue from tool use overlap due to limited tool resources.

Key words: tool constraints, job-shop scheduling, immune genetic algorithm

中图分类号: 


版权所有 © 《现代制造工程》编辑部 
地址:北京市东城区东四块玉南街28号 邮编:100061 电话:010-67126028 电子信箱:2645173083@qq.com
本系统由北京玛格泰克科技发展有限公司设计开发 技术支持:support@magtech.com.cn
访问总数:,当日访问:,当前在线: