[1] RICKLI J L,CAMELIO J A.Multi-objective partial disassembly optimization based on sequence feasibility[J].Journal of Manufacturing Systems,2013,32(1):281-293. [2] MITROUCHEY P,WANG C G,CHENG J T.Virtual Disassembly Sequences Generation and Evaluation [J].Procedia Cirp,2016,44(3):347-352. [3] PAK K G,SODHI R.Destructive disassembly of bolts and screws by impact fracture[J].Journal of Manufacturing Systems,2002,21(4):316-324. [4] 宋小文,潘兴兴.部分破坏模式下的机电产品拆卸序列规划[J].计算机集成制造系统,2012,18(5):927-936. [5] 宋小文,潘兴兴.面向零件不可拆的复杂产品拆卸序列规划[J].计算机集成制造系统,2013,19(6):1249-1256. [6] 王淑旺,刘志峰,胡迪,等.基于不确定规划的产品拆卸序列规划[J].中国机械工程,2012,23(18):2143-2148.
[7] 陈旭玲,楼佩煌.部分破坏拆卸模式下拆卸序列规划[J].南京航空航天大学学报,2014,46(6):945-951. [8] 张旭刚,张华,江志刚.基于剩余使用寿命评估的再制造方案决策模型及应用[J].机械工程学报,2013,49(7):51-58. [9] 于晓红,张来斌,王朝晖,等.基于新的威布尔分布参数估计法的设备寿命可靠性分析[J].机械强度,2007,26(9):932-936. [10] 张秀芬,张树友.基于粒子群算法的产品拆卸序列规划方法[J].计算机集成制造系统,2009,15(3):508-514. [11] SMITH S,SMITH G,CHEN W H.Disassembly sequence structure graphs:An optimal approach for multiple-target selective disassembly sequence planning[J].Advanced Engineering Informatics,2012,26(2):306-316. [12] GONZALEZ B,ADENSO-DIAZ B.A scatter search approach to the optimum disassembly sequence problem[J].Computers & Operations Research,2006,33(6):1776-1793. [13] YOUSSI M M,ALKADEEM R A,DARDIRY M A E.Incorporating ergonomic factors in disassembly sequence planning[J].World Pumps,2011,50(3):213-217. [14] LAMBERT A J D.Optimizing disassembly processes subjected to sequence-dependent cost[J].Computers & Operations Research,2007,34(2):536-551. [15] 陈弋文,陈伟达.基于收益概率的不确定环境下的产品拆卸序列优化[J].计算机集成制造系统,2014,20(4):49-55. [16] 吕风县,张桂香,张庆洪.基于拆卸和拆卸约束矩阵的装配序列规划[J].现代制造工程,2014(1):21-24. |