[1] 王永明,尹红丽,秦开大.作业车间调度理论及其优化方法研究[M].北京: 科学出版社,2013. [2] PETER B,BURKE E K G.A branch and bound algorithm for the cyclic job-shop problem with transportation[J].Computers and Operations Research,2012,39(12): 3200-3214. [3] NGUYEN S,ZHANG M,JOHNSTON M.Automatic design of scheduling policies for dynamic multi-objective job shop scheduling via cooperative coevolution genetic programming[J].IEEE Transactions on Evolutionary Computation,2014,18(2): 193-208. [4] LI J,PAN Q,WANG Y.A hybrid algorithm for multi-objective job shop scheduling problem.Control and Decision Conference(CCDC)[C].[S.l.]:[s.n],2011: 3630-3634. [5] YUAN S,YIN A,LIU L.Application of machine assignment in solving the flexible job shop scheduling problem[J].Information Management,Innovation Management and Industrial Engineering,2010(4):378-380. [6] 刘胜辉,张淑丽,滕春贤.考虑不确定因素的单件小批作业计划与调度动态算法[J].哈尔滨工程大学学报,2011,32(4): 471-475. [7] 李海清.离散型制造企业设备管理系统研究与开发[J].中国高新技术企业,2010(3): 52-53. [8] 吴浩亮,张明峰,陈波,等.中国铅酸蓄电池行业现状与展望[J].工程建设与设计,2011(7): 122-125. [9] 刘铭.汽轮机的原理及结构分析[J].中小企业管理与科技,2011(11): 303-304. [10] ZHANG Shuli,LIU Shenghui.Topology algorithm for job shop scheduling problem with correlative operations[J].Computer Engineering and Applications,2013,49(3): 251-254. [11] 奇成光.轴流式水轮机的典型结构分析[J].红水河,2010,29(2): 66-68. [12] 白洪涛,孙吉贵,焦洋.网络优化算法的实现与比较[J].吉林大学学报(信息科学版),2002,20(2): 59-69. [13] 谢深泉.一种表示有向图的表方法及其应用[J].小型微型计算机系统,2011(6): 1211-1217. [14] 王茜,李安颖,葛新,等.基于图的最短路径跨域数据交换实现[J].计算机技术与发展,2013,23(12): 59-65. [15] 王利钢,陈平.基于十字链表的关联规则改进算法[J].宝鸡文理学院学报(自然科学版),2016,36(4): 1-4. |