[1] LEE T E.A review of scheduling theory and methods for semiconductor manufacturing cluster tools.Proceedings of the 40th conference on winter simulation[C].Piscataway,USA: IEEE,2008: 2127-2135. [2] BADER M E,HALL R P,STRASSER G.Integrated processing equipment[J].Solid State Technology,1990,33(5): 149-154. [3] BURGGRAAF P.Coping with the high cost of wafer fabs[J].Semiconductor International,1995,18(3): 45-54. [4] PERKINSON T L,MCLARTY P K,GYURCSIK R S,et al.Single-wafer cluster tool performance: An analysis of throughput[J].IEEE Transactions on Semiconductor Manufacturing,1994,7(3):369-373. [5] PERKINSON T L,GYURCSIK R S,MCLARTY P K.Single-wafer cluster tool performance: An analysis of the effects of redundant chambers and revisitation sequences on throughput[J].IEEE Transactions on Semiconductor Manufacturing,1996,9(3):384-400. [6] ROSTAMI S,HAMIDZADEH B,CAMPORESE D.An optimal periodic scheduler for dual-arm robots in cluster tools with residency constraints[J].IEEE Transactions on Robotics and Automation,2001,17(5):609-618. [7] ROSTAMI S,HAMIDZADEH B.Optimal scheduling techniques for cluster tools with process-module and transport-module residency constraints[J].IEEE Transactions on Semiconductor Manufacturing,2002,15(3): 341-349. [8] WU N Q,CHU C B,CHU F,et al.A Petri net method for schedulability and scheduling problems in single-arm cluster tools with wafer residency time constraints[J].IEEE Transactions on Semiconductor Manufacturing,2008,21(2):224-237. [9] WU N Q,ZHOU M C.A closed-form solution for schedulability and optimal scheduling of dual-arm cluster tools with wafer residency time constraint based on steady schedule analysis[J].IEEE Transactions on Automation Science and Engineering,2010,7(2): 303-315. [10] KIM J H,LEE T E.Schedulability analysis of time-constrained cluster tools with bounded time variation by an extended Petri net[J].IEEE Transactions on Automation Science and Engineering,2008,5(3): 490-503. [11] QIAO Y,WU N Q,ZHOU M C.Real-time scheduling of single-arm cluster tools subject to residency time constraints and bounded activity time variation[J].IEEE Transactions on Automation Science and Engineering,2012,9(3):564-577. [12] LEE J H,KIM H J,LEE T E.Scheduling Cluster Tools for Concurrent Processing of Two Wafer Types[J].IEEE Transactions on Automation Science and Engineering,2014,11(2):525-536. [13] 郑秀红,胡静涛,于海斌.基于随机Petri网的集束型装备模型及Markov分析[J].信息与控制,2011,40 (4) : 472-476. |