[1] 刘强.数控机床发展历程及未来趋势[J].中国机械工程,2021,32(7):757-770. [2] 张根保,罗天洪.“高档数控机床的高端制造模式”(四):数控机床的先进制造模式研究[J].计算机集成制造系统,2023,29(7):2191-2200. [3] ZHOU G,CHANG F,TIAN C,et al.A reliability optimization allocation method for the hydraulic system of CNC honing machine considering the operating condition information[J].ARCHIVE Proceedings of the Institution of Mechanical Engineers Part C Journal of Mechanical Engineering Science 1989-1996,2018,232(12):2244-2264. [4] 代愽超,张英杰,李阳帆,等.基于性能退化预测的数控机床预防维修方法[J].中国机械工程,2019,30(17):2122-2128. [5] 王智明,杨建国.数控机床边界强度过程的非等周期不完全预防维修[J].上海交通大学学报,2013,47(11):1661-1665. [6] CHENG C Y,ZHAO X F,CHEN M,et al.A failure-rate-reduction periodic preventive maintenance model with delayed initial time in a finite time period[J].Quality Technology & Quantitative Management,2014,11(3):245-254. [7] HUANG R,MENG L,XI L,et al.Modeling and analyzing a joint optimization policy of block-replacement and spare inventory with random-leadtime[J].IEEE Transactions on Reliability,2008,57(1):113-124. [8] LEE J,KIM B,AHN S.Maintenance optimization for repairable deteriorating systems under imperfect preventive maintenance[J].Mathematics,2019,7(8):716. [9] DUAN C Q,DENG H,WANG B R.Multi-phase sequential preventive maintenance scheduling for deteriorating repairable systems[J].Journal of Intelligent Manufacturing,2019,30(4):1779-1793. [10] MABROUK A B,CHELBI A,RADHOUI M.Optimal hybrid imperfect preventive maintenance policy for leased equipment[J].IFAC-PapersOnLine,2017,50(1):13698-13703. [11] LI X L,RAN Y,ZHANG G B.Optimization of equal-cycle maintenance strategy considering imperfect preventive maintenance[J].Proceedings of the Institution of Mechanical Engineers,Part E:Journal of Process Mechanical Engineering,2022,236(4):1392-1402. [12] LI X,RAN Y,WAN F,et al.Condition-based maintenance strategy optimization of meta-action unit considering imperfect preventive maintenance based on Wiener process[J].Flexible Services and Manufacturing Journal,2022,34:204-233. [13] ZHANG X F,XIA T B,PAN E S,et al.Integrated optimization on production scheduling and imperfect preventive maintenance considering multi-degradation and learning forgetting effects[J].Flexible Services and Manufacturing Journal,2022,34(2):451-482. [14] 李军亮,祝华远,王利明,等.考虑混合维修策略的复杂系统区间可用度[J].系统工程与电子技术,2020,42(5):1190-1196. [15] 李雯静,邱莉,林志勇,等.基于役龄回退模型的露天矿卡车周期预防性维护策略[J].煤炭科学技术,2023,51(4):209-214. [16] XU B B,WANG Z Y,LUO W,et al.A Research on the Combined Maintenance Strategy for Production Line Equipment Based on Mixed Failure Rate[J].Mathematical Problems in Engineering,2021,2021(1):8856279. [17] BEHZAD K,NIKAI A T S,HASSAN H,et al.Reliability optimization of tools with increasing failure rates in a flexible manufacturing system[J].Arabian Journal for Science and Engineering,2019,44(3):2579-2596. [18] QI G,LI Y,YONGHUA L.Dynamic Preventive Maintenance Optimization of Subway Vehicle Traction System Considering Stages[J].Applied Sciences,2022,12(17):8617. [19] DAPENG N,LEI G,XINIAOL B.Preventive maintenance period decision for elevator parts based on multi-objective optimization method[J].Journal of Building Engineering,2021,44:102984. [20] WU Y,YANG Z,WANG J,et al.Optimizing opportunistic preventive maintenance strategy for multi-unit system of CNC lathe[J].Journal of Mechanical Science and Technology,2022,36(1):145-155. [21] DRIESSEN J P C,PENG H,VAN HOUTUM G J.Maintenance optimization under non-constant probabilities of imperfect inspections[J].Reliability Engineering & System Safety,2017,165:115-123. [22] HU J,JIANG Z,LIAO H.Preventive maintenance of a single machine system working under piecewise constant operating condition[J].Reliability Engineering & System Safety,2017,168:105-115. [23] GHAROUN H,HAMID M,TORABI S A.An integrated approach to joint production planning and reliability-based multi-level preventive maintenance scheduling optimisation for a deteriorating system considering due-date satisfaction[J].International Journal of Systems Science:Operations & Logistics,2022,9(4):489-511. [24] 李建华,徐家生,任丽娜.可靠度约束下的不完全预防更换维修模型[J].太阳能学报,2022,43(4):446-452. [25] GUO J F,RUI Z Y,FENG R C,et al.Imperfect preventive maintenance for numerical control machine tools with log-linear virtual age process[J].Journal of Central South University,2014,21(12):4497-4502. [26] 侯胜冬.基于可靠性分析的加工中心维修策略研究[D].长春:吉林大学,2022. [27] 王智明,杨建国.数控机床可靠性评估中的边界强度过程[J].上海交通大学学报,2012,46(10):1622-1626,1631. [28] 王智明,杨建国.数控机床边界强度过程的非等周期不完全预防维修[J].上海交通大学学报,2013,47(11):1661-1665. |